/*
 * Copyright (C) 2007, Robin Rosenberg <robin.rosenberg@dewire.com>
 * Copyright (C) 2008, Shawn O. Pearce <spearce@spearce.org>
 * and other copyright owners as documented in the project's IP log.
 *
 * This program and the accompanying materials are made available
 * under the terms of the Eclipse Distribution License v1.0 which
 * accompanies this distribution, is reproduced below, and is
 * available at http://www.eclipse.org/org/documents/edl-v10.php
 *
 * All rights reserved.
 *
 * Redistribution and use in source and binary forms, with or
 * without modification, are permitted provided that the following
 * conditions are met:
 *
 * - Redistributions of source code must retain the above copyright
 *   notice, this list of conditions and the following disclaimer.
 *
 * - Redistributions in binary form must reproduce the above
 *   copyright notice, this list of conditions and the following
 *   disclaimer in the documentation and/or other materials provided
 *   with the distribution.
 *
 * - Neither the name of the Eclipse Foundation, Inc. nor the
 *   names of its contributors may be used to endorse or promote
 *   products derived from this software without specific prior
 *   written permission.
 *
 * THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND
 * CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES,
 * INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES
 * OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
 * ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR
 * CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL,
 * SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT
 * NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES;
 * LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER
 * CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT,
 * STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE)
 * ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF
 * ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.
 */

package org.eclipse.jgit.lib;

A progress reporting interface.
/** * A progress reporting interface. */
public interface ProgressMonitor {
Constant indicating the total work units cannot be predicted.
/** Constant indicating the total work units cannot be predicted. */
int UNKNOWN = 0;
Advise the monitor of the total number of subtasks.

This should be invoked at most once per progress monitor interface.

Params:
  • totalTasks – the total number of tasks the caller will need to complete their processing.
/** * Advise the monitor of the total number of subtasks. * <p> * This should be invoked at most once per progress monitor interface. * * @param totalTasks * the total number of tasks the caller will need to complete * their processing. */
void start(int totalTasks);
Begin processing a single task.
Params:
  • title – title to describe the task. Callers should publish these as stable string constants that implementations could match against for translation support.
  • totalWork – total number of work units the application will perform; UNKNOWN if it cannot be predicted in advance.
/** * Begin processing a single task. * * @param title * title to describe the task. Callers should publish these as * stable string constants that implementations could match * against for translation support. * @param totalWork * total number of work units the application will perform; * {@link #UNKNOWN} if it cannot be predicted in advance. */
void beginTask(String title, int totalWork);
Denote that some work units have been completed.

This is an incremental update; if invoked once per work unit the correct value for our argument is 1, to indicate a single unit of work has been finished by the caller.

Params:
  • completed – the number of work units completed since the last call.
/** * Denote that some work units have been completed. * <p> * This is an incremental update; if invoked once per work unit the correct * value for our argument is <code>1</code>, to indicate a single unit of * work has been finished by the caller. * * @param completed * the number of work units completed since the last call. */
void update(int completed);
Finish the current task, so the next can begin.
/** * Finish the current task, so the next can begin. */
void endTask();
Check for user task cancellation.
Returns:true if the user asked the process to stop working.
/** * Check for user task cancellation. * * @return true if the user asked the process to stop working. */
boolean isCancelled(); }